Working at Sulimanya-Gaspipeline from Chemchemal Station to Bazian Power plant receiver.Qaiwan Group
Updated: Sep 27, 2020
Designing a 16 km plan and profile according to the classifications
of the pipes for gas pipes from Chemchemal Station to Bazyan Receive Station and supervising all surveying works of two stations and preparing all the as-built drawings.
Comments