top of page
Writer's pictureJwan Ebrahem

Working at Sulimanya-Gaspipeline from Chemchemal Station to Bazian Power plant receiver.Qaiwan Group

Updated: Sep 27, 2020

Designing a 16 km plan and profile according to the classifications


of the pipes for gas pipes from Chemchemal Station to Bazyan Receive Station and supervising all surveying works of two stations and preparing all the as-built drawings.


9 views0 comments

Comments


bottom of page