Surveying Halabjah Shahid and making the general master plan

  • Writer: Jwan Ebrahem
    Jwan Ebrahem
  • Sep 22, 2020
  • 1 min read

Updated: Nov 8, 2020

Making general master plan and designing pipelines and implementation 430 km with Ssangyong, Khatib Alami, Zozik, transmission lines with laterals pipeline and grit removal chambers&intake&WTP&pressure break tanks with 3 tanks 15000cu.m and 5000cu,m and making 1200 control points,Profiles.






 
 
 