Making general master plan and designing pipelines and implementation 430 km with Ssangyong, Khatib Alami, Zozik, transmission lines with laterals pipeline and grit removal chambers&intake&WTP&pressure break tanks with 3 tanks 15000cu.m and 5000cu,m and making 1200 control points,Profiles.