top of page

Surveying by eBee Fly and GNSS for the gas pipeline from FSK TO PSK 15km at Zakho with DNO.

  • Writer: Jwan Ebrahem
    Jwan Ebrahem
  • Apr 7, 2019
  • 1 min read

Updated: Sep 23, 2020

Surveying and designing the crud pipeline 10&12'' civil and mechanical works y GNSS and eBee science fly drone from FSK TO PSK with DNO-SALP.ME-RENWA companies, and preparing all as-built drawings with ending points.





 
 
 

Comments


Iraq-Kurdistan - Erbil. Email:  eng.juanssy1@gmail.com       Mob: +964 751 424 5379 \ +964 780 058 1247

bottom of page