Surveying by eBee Fly and GNSS for the gas pipeline from FSK TO PSK 15km at Zakho with DNO.
- Jwan Ebrahem
- Apr 7, 2019
- 1 min read
Updated: Sep 23, 2020
Surveying and designing the crud pipeline 10&12'' civil and mechanical works y GNSS and eBee science fly drone from FSK TO PSK with DNO-SALP.ME-RENWA companies, and preparing all as-built drawings with ending points.








Comments